[SMM Analysis] Grenergy will invest 3.5 billion euros in BESS solar and energy storage systems (ESS) by 2027

Published: May 30, 2025 13:22
[SMM Analysis] Spanish renewable energy company Grenergy plans to invest 3.5 billion euros in battery energy storage systems (BESS) and PV-ESS projects by 2027, a move that will drive significant growth for the company in the energy sector.

Spanish renewable energy company Grenergy plans to invest 3.5 billion euros in battery energy storage systems (BESS) and PV energy storage projects by 2,027, a move that will drive significant growth for the company in the energy sector.

Grenergy is an independent power producer (IPP) headquartered in Spain, specializing in renewable energy and energy storage solutions, with operations spanning Europe, Latin America, and Oceania. This investment focuses on three key areas: first, replicating the success of its 2GW/11GWh Atacama Oasis project in Chile in both Chile and Spain; second, launching the European independent BESS platform named Greenbox; and third, achieving round-the-clock solar energy supply through its Chilean energy retailer GR Power, leveraging energy storage systems.

Chile boasts abundant solar energy resources, with the Atacama Desert in the north being one of the regions with the highest solar radiation intensity globally, providing ideal conditions for large-scale solar and energy storage projects. The Atacama Oasis project, as one of the world's largest solar and energy storage projects, offers valuable experience for other countries and regions.

By the end of 2,027, Grenergy expects its installed PV capacity to reach 4.4GW and its BESS capacity to reach 18.8GWh. The company's EBITDA in the energy sector is projected to reach 450 million to 500 million euros. David Ruiz de Andrés, CEO of Grenergy, stated, "We are entering a new growth cycle centered around energy storage and round-the-clock clean energy management."

Grenergy plans to replicate the success of the Atacama Oasis project in Chile and Spain. Currently, the company's Central Oasis project in Chile has been approved and is expected to be completed by 2,027. The project will have a solar PV capacity of 1.1GW and a BESS capacity of 3.8GWh, with an investment of 900 million euros. In Spain, the company's flagship project, Escuderos, is expected to commence construction in the second half of 2,025 and become fully operational in 2,027. The project includes 200MW of solar PV and 704MWh of BESS, and a 12-year daytime power purchase agreement (PPA) was signed with Spanish energy company Galp in 2,021.

Grenergy has launched the European independent BESS platform named Greenbox, aiming to expand its multi-market operations. The platform's projects are distributed across Poland (7GWh), Romania (6.7GWh), Germany (6.4GWh), Italy (5.8GWh), Spain (4.6GWh), and the UK (4.6GWh), with a total development plan reaching 35GWh. In Spain, the Oviedo project will become the flagship project of the platform, with a total capacity of 600 MWh. Construction is expected to commence in the first half of 2026 (H1 2026), and the project will become operational in 2027.

Grenergy is enhancing its round-the-clock energy management capabilities through GR Power, its energy retailer in Chile. GR Power will focus on the unregulated electricity market in Chile, particularly targeting mining companies and data centers. The PPA with Codelco is one of the round-the-clock base-load PPAs that GR Power plans to replicate.


 

SMM New Energy Industry Research Department

Wang Cong 021-51666838

Ma Rui 021-51595780

Feng Disheng 021-51666714

Lv Yanlin 021-20707875

Zhou Zhicheng 021-51666711

Zhang Haohan 021-51666752

Wang Zihan 021-51666914

Wang Jie 021-51595902

Xu Yang 021-51666760

Chen Bolin 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago